Hello Everyone, This is My first blog ever. I have created this blog to discuss about various topics in the field of ASIC. You'll find lot of useful information about verification. Keep visiting this site for more updates.
Parts of a Test Specification
A Test Specification should consists of the following parts:
Setting Test Case Priority
A Test Specification may have a couple of hundred test cases, depending on how the test cases were defined, how large the feature area is, and so forth. It is important to be able to query for the most important test cases (nightly), the next most important test cases (weekly), the next most important test cases (full test pass) and so forth. A sample prioritization for test cases may look like:
INTRODUCTION
System specific requirements focus more on system level issues such as reset generation logic and clock generation logic can be completely verified only on system level.
Examples of system-specific requirements are
Verifying the system is properly reset for the different types of reset
Verifying the system for different types of power saving modes
Verifying the interconnectivity of clock
Verifying the connectivity to pads, interrupts, debug interfaces.
With this approach, the peripheral is verified completely in the module level. The SOC level verification could then focus more on top-level issues such as interconnectivity, interrupt system behavior (response of interrupt for that peripheral), bus interfaces, I/O interfaces. The system level verification could focus more on system level issues and speed up the overall verification process.
COVERAGE HOLESEMBEDDED F/W REQUIREMENTS
An embedded firmware can be described as a piece of software embedded into the ROM/EPROM which would initialize the chip into a defined state on reset. This piece of software could contain Startup sequences, bootstrap loaders, memory test routines, tests for production etc. It can be seen that this software is very complex and the corresponding verification is a complex task. Unlike the verification of peripherals, firmware verification is restricted to SOC level which further increases the complexity of verification. So how do we ensure this piece of software works? For firmware verification, it is necessary to have a good coverage metric. During the verification planning phase, we need to identify all the coverage points with iterative process of review from the members involved in the development of concept and firmware. Normally the firmware verification plan is a list of coverage items that needs to be addressed in the process.
Figure shows the coverage points for firmware ( Thanks to http://www.us.design-reuse.com)
An example of Firmware code
The firmware code can then be translated to a flow chart which gives the verification engineer an overview of the software flow.
Conclusion
Verification plan gives an early estimate on effort, resource required, reuse percentage and coverage goals. Verification closure is an iterative process where the plan is measured against the implementation and coverage goals. Verification reuse can be achieved with proper planning, reusable verification environment and proper documentation.